Commuter Services

Alma Allred retires after 30 years

Thank you for 30 years of service.


UTA on Demand by Via

The new service aims to enhance connectivity to TRAX and FrontRunner lines for commuters.


Back-to-school transportation guide for spring

Tips and tricks for getting to, and getting around, campus.


Final commute of fall 2019

Fuel up for a successful finals week.


A to U Parking

From ‘A’ to ‘U’

Students with “U” parking permits may park in designated “A” lots after 3 p.m. This option enhances safety by allowing students to park in lots closer to main campus buildings during the evening.


SafeRide is going places

A new campus transportation service provides a safe and reliable ride on campus during night hours.


Back-to-school commuter guide

Check out these options to find a mode of transportation that works for you.


Lane and road closures on 500 South

A conference at Rice-Eccles Stadium will draw roughly 30,000 people July 17-20, 2019. Lane and road closures will take place at 500 South, between 1300 East and Guardsman Way, as well as along University Street.


Downtown TRAX construction

UTA TRAX construction on the Main Street corridor between 100 and 500 South will begin May 4, 2019. Reach more about what to expect and how to navigate the closures.


1300 East reconstruction

Construction on the 1300 East corridor, between 1300 South and 2100 South, will begin again on May 13, 2019, with full section road closures. Expect delays and plan on alternate routes when navigating through the area.