Main Navigation

Commuter alert: Foothill closure

I-80 ramps accessing northbound Foothill Drive will be closed beginning Monday, May 8. Click for detour information.

UDOT will be repairing bridges in the Foothill Drive/Parley’s Canyon area along I-80 and I-215 beginning Monday, May 8, 2017.

The following areas will be affected by the construction:

  • The ramp from westbound I-80 to northbound Foothill Drive/Parley’s Way will be closed from Monday, May 8, through mid-July.
  • The loop ramp from eastbound I-80 to northbound Foothill Drive will be closed beginning May 8, through mid-September.
  • Access to northbound Foothill Drive from I-215 will be reduced to one lane beginning May 8. Expect delays and follow the detour route:
    • Exit I-80 to southbound I-215.
    • Continue south to exit at 3300 South.
    • Proceed left over the freeway and take the I-215 northbound.
    • Access Foothill Drive from I-215 northbound.

The construction in this area will enhance safety, preserve infrastructure and optimize mobility along I-80, one of Utah’s most heavily traveled freeways.

Construction updates will be posted online at udot.utah.gov/renovatei80 and UDOT encourages people to sign up for weekly email updates. To sign up, send an email to i80foothill@utah.gov with “updates” in the subject line.

As a reminder, your UCard doubles as a UTA pass. Ride for free and go to ride.uta.com for routes and schedules.